Advanced Equipment Corporation
Contact
Projects hero
PROJECT GALLERY

Completed Projects

Explore our portfolio of operable partition installations across convention centers, education, hospitality, and specialty venues throughout North America and beyond.

1000+
Projects Completed
40+
Years Experience
100%
Custom Solutions

Showing 34 projects

Featured Projects

LCISD Liberty Hill High School
FEATURED
Education

LCISD Liberty Hill High School

Lubbuck, TX

High school academic wing featuring manual and electric operable partitions including stair-conforming panels spanning two runs. Completed 2025.

SYSTEMS USED:

Panel ConstructionSpacematic AutomationTrack SystemsPassdoors & Pocket Doors

Coverage Area

~4,000 SF

Tillamook Bay Community College
FEATURED
Education

Tillamook Bay Community College

Tillamook, OR

Community college with manual and electric operable partitions, vertical grain wood veneer finish, Image 'J' panel manual slider, and integrated pass-doors. Completed 2025.

SYSTEMS USED:

Image PartitionsTrack SystemsPassdoors & Pocket Doors

Coverage Area

~1,748 SF

Jacob Javits Convention Center
FEATURED
Convention Centers

Jacob Javits Convention Center

New York, NY

186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.

SYSTEMS USED:

Manual OperationSpacematic AutomationALPHA Series PanelsRemote Storage

Coverage Area

186,446 SF

All Projects

Centro Deportivo Universidad Católica
Educational Facilities

Centro Deportivo Universidad Católica

Santiago, Chile

2,642 SF manual remote-stack SIGMA 'E' panel system on #2 track with vinyl finish and pocket doors, installed beneath a dramatic curved concrete arch ceiling. Sports and multipurpose facility for Universidad Católica. Completed 2021.

SYSTEMS:

Manual Operation — Remote Stack#2 TrackSIGMA 'E' Panel ConstructionVinyl FinishPocket Doors

Coverage

2,642 SF

Cal Poly San Luis Obispo
Educational Facilities

Cal Poly San Luis Obispo

San Luis Obispo, CA

2,373 SF Spacematic automated SIGMA 'D' panel system on #8 track in standard vinyl. Arch: Pfeiffer Architecture. GC: Maino Construction Co. Inc. Completed 2021.

SYSTEMS:

Spacematic AutomationSIGMA 'D' Panel Construction

Coverage

2,373 SF

Queens University, Levine Center
Educational Facilities

Queens University, Levine Center

Charlotte, NC

10,694 SF dual-system installation — electric continuously hinged ALPHA 'U' panels up to 43 ft tall on #6 track plus manual SIGMA 'C' paired panels. GC: Rodgers Builders Inc. Completed 2012.

SYSTEMS:

Electric Operation — Continuously HingedALPHA 'U' Panel ConstructionManual Paired Panels — SIGMA 'C'

Coverage

10,694 SF

Del Oro High School
Educational Facilities

Del Oro High School

Loomis, CA

2,201 SF manual GAMMA 'O' paired panel system on #2 track with full-height marker board finish. Arch: HMC Architects. GC: S C Anderson Inc. Completed 2022.

SYSTEMS:

Manual Paired PanelsGAMMA 'O' Panel ConstructionMarker Board Finish

Coverage

2,201 SF

Kimball Elementary School
Educational Facilities

Kimball Elementary School

Seattle, WA

1,427 SF electric ALPHA 'T' panel system on #8B track with a school-designed custom typographic world spice map graphic spanning the full run. Arch: NAC Architecture. GC: Cornerstone General Contractors. Completed 2023.

SYSTEMS:

Electric OperationALPHA 'T' Panel ConstructionCustom Graphics

Coverage

1,427 SF

Trident Technical College
Educational Facilities

Trident Technical College

Charleston, SC

4,010 SF dual-system installation combining electric continuously hinged ALPHA 'S' panels on #1A track in standard fabric with manual ALPHA 'U' individual and paired panels on #2 track. Flexible space division for lecture halls, breakout sessions, and collaborative learning environments. Completed 2014.

SYSTEMS:

Electric Operation — Continuously Hinged PanelsALPHA 'S' Panel ConstructionManual Operation — Individual & Paired PanelsALPHA 'U' Panel Construction

Coverage

4,010 SF

Tijuana Convention Center
Convention Centers

Tijuana Convention Center

Tijuana, Mexico

12,972 SF multi-system installation combining electric (#6 track) and manual (#8 track) ALPHA 'U' panels with two-tone vinyl finish. GC: IHO Espacios. Completed 2012.

SYSTEMS:

Electric OperationManual OperationALPHA 'U' Panel Construction

Coverage

12,972 SF

Costa Rica Convention Center
Convention Centers

Costa Rica Convention Center

Heredia, Costa Rica

12,979 SF tri-system installation designed by Gensler — manual remote ALPHA 'U' on #8 Super Track, manual remote SIGMA 'E' on #1A, and electric ALPHA 'X' on #1 track. All standard vinyl finish. Completed 2017.

SYSTEMS:

Manual Operation — Remote#8 Super TrackALPHA 'U' PanelSIGMA 'E' PanelElectric OperationALPHA 'X' Panel

Coverage

12,979 SF

Conventiones Lima
Convention Centers

Conventiones Lima

Lima, Peru

Large-scale manual operable partition system across 15,374 SF at one of Peru's premier convention facilities, featuring SIGMA 'C' panels with #1A, #2, and #8 track configurations. Completed 2015.

SYSTEMS:

Manual OperationSIGMA 'C' Panel ConstructionALPHA 'P' Exterior Panels

Coverage

15,374 SF

Yucatan Convention Center
Convention Centers

Yucatan Convention Center

Yucatan, Mexico

30,270 SF manual operable partition system with remote storage and pocket doors. SIGMA 'E' panels with carpet finish. Completed 2017.

SYSTEMS:

Manual OperationRemote StoragePocket DoorsSIGMA 'E' Panel#1 Track

Coverage

30,270 SF

Asamblea Legislativa Costa Rica
Specialties

Asamblea Legislativa Costa Rica

San José, Costa Rica

300 SF manual center-stacked IMAGE 'J' glass panels with premium wood clad finish installed in Costa Rica's Legislative Assembly. Walnut-framed glass panels create transparent acoustic separation in this civic landmark. Completed 2020.

SYSTEMS:

Manual Operation — Center StackedIMAGE 'J' Panel ConstructionWood Clad Finish

Coverage

300 SF

San Diego Library
Educational Facilities

San Diego Library

San Diego, CA

2,277 SF electric dual-system installation combining IMAGE 'J' glass panels on #6 track with ALPHA 'T' panels on #1 track. Modern public library pavilion with flexible meeting and event spaces. Arch: Tucker Sadler Architects. GC: Turner Construction. Completed 2014.

SYSTEMS:

Electric OperationIMAGE 'J' Glass PanelsALPHA 'T' Panel Construction

Coverage

2,277 SF

Cedar Park Christian School
Educational Facilities

Cedar Park Christian School

Bothell, WA

Electric continuously hinged bi-parting ALPHA 'U' panels on #8 track, plus manual paired ALPHA 'S' panels on #1 track. Completed 2004.

SYSTEMS:

Electric Bi-PartingALPHA 'U' Panel#8 TrackManual Paired PanelsALPHA 'S' Panel#1 Track

Coverage

2,920 SF

Hotel W Reserva Conchal
Hospitality

Hotel W Reserva Conchal

Guanacaste, Costa Rica

462 SF manual paired ALPHA 'S' panel system on #2 track with custom fabric finish. Premium resort conference and event space. Completed 2018.

SYSTEMS:

Manual Operation — Paired PanelsALPHA 'S' Panel ConstructionCustom Fabric Finish

Coverage

462 SF

Hilton Botanika Osa Peninsula
Hospitality

Hilton Botanika Osa Peninsula

Osa Peninsula, Costa Rica

SIGMA 'D' manual paired operable partitions on #2 track with standard vinyl finish at the Hilton Botanika Curio Collection. Arch: Arq. Andrea Sotomayor. GC: Prodeyco. Completed 2022.

SYSTEMS:

Manual Paired PanelsSIGMA 'D' Panel Construction

Coverage

Hyatt Regency Lake Washington
Hospitality

Hyatt Regency Lake Washington

Renton, WA

Premium hospitality operable partition system across 8,713 SF at the Hyatt Regency Lake Washington, featuring custom walnut wood-veneer and AEC Standard fabric finishes. Completed 2017.

SYSTEMS:

Manual OperationSIGMA 'B' Panel ConstructionSIGMA 'D' Panel Construction

Coverage

8,713 SF

Daniel's Broiler
Hospitality

Daniel's Broiler

Bellevue, WA

334 SF manual ALPHA 'S' individual panel system on #1 and #3 tracks with custom wood clad and mirror finish for upscale private dining. Arch: Mesher Shing McNutt. Completed 2013.

SYSTEMS:

Manual Operation — Individual PanelsALPHA 'S' Panel ConstructionRemote Storage

Coverage

334 SF

Regional Utilities
Commercial

Regional Utilities

Navarre, FL

297 SF manual single slider glass panel system on #8 track with glass finish for modern office entry. Arch: DAG Architects. Completed 2007.

SYSTEMS:

Manual OperationSingle Slider PanelsRemote Stack

Coverage

297 SF

Congregation Rodef Shalom
Worship

Congregation Rodef Shalom

San Rafael, CA

1,751 SF multi-system installation with SIGMA 'E' wood veneer and fabric panels plus ALPHA 'P' perforated acoustic panels (NRC .65). Arch: Herman Coliver Locus. Completed 2023.

SYSTEMS:

Manual Operation — Paired PanelsSIGMA 'E' PanelALPHA 'P' Perforated PanelsRemote Stack

Coverage

1,751 SF

Temple Israel
Worship

Temple Israel

Long Beach, CA

588 SF dual-system installation combining electric continuously hinged SIGMA 'C' panels on #1 track with manual paired SIGMA 'C' panels on #1 track, both featuring custom wood veneer finish and concealed SOSS hinges for pocket doors. GC: Hale Corporation. Completed 2015.

SYSTEMS:

Electric Operation — Continuously HingedSIGMA 'C' Panel ConstructionManual Operation — Paired Panels

Coverage

588 SF

12 Technologies
Commercial

12 Technologies

Location not specified

715 SF electric curved track and panel system featuring ALPHA 'P' panels creating a dramatic curved space with seamless architectural integration. Arch: The Lauck Group. Completed 2000.

SYSTEMS:

Electric OperationCurved Track and PanelsALPHA 'P' Panel Construction

Coverage

715 SF

Vacheron Constantin
Retail

Vacheron Constantin

Miami, FL

260 SF electric curved track and panel system featuring ALPHA 'S' panels in a luxury retail environment. Premium curved partition system creating an elegant boutique display space with integrated lighting and refined finishes. Completed 2025.

SYSTEMS:

Electric OperationCurved Track and PanelsALPHA 'S' Panel Construction

Coverage

260 SF

BAC Solarium
Commercial

BAC Solarium

Liberia Guanacaste, Costa Rica

933 SF dual-system installation combining manual GAMMA 'O' paired and individual panels with standard vinyl finish on #2 track and IMAGE 'J' panels with ½" tempered glass. Modern banking and collaborative office environment. Arch: Gensler. Completed 2023.

SYSTEMS:

Manual Operation — Paired and Individual PanelsGAMMA 'O' Panel ConstructionIMAGE 'J' Glass Panels

Coverage

933 SF

JW Marriott Ilhilani
Hospitality

JW Marriott Ilhilani

Oahu, HI

9,195 SF dual-system installation combining manual ALPHA 'S' panels with vinyl finish on #1 track and IMAGE 'J' glass panels with trynemic frame finish on #1A track. Premier resort pavilion providing flexible event and meeting space with ocean views. Arch: Kollin Altomare. GC: Airwall Technicians. Completed 2009.

SYSTEMS:

Manual Operation — Paired and Individual PanelsALPHA 'S' Panel ConstructionIMAGE 'J' Glass Panels

Coverage

9,195 SF

Consolidadora Chilena
Commercial

Consolidadora Chilena

San Antonio, Chile

Eight-system installation combining 3 manual curved and 5 manual remote-stack SIGMA 'C' panel configurations on #2 track. Flexible corporate space for Consolidadora Chilena's San Antonio offices. Completed 2015.

SYSTEMS:

Manual Operation — Curved (3MC)Manual Operation — Remote Stack (5MR)#2 TrackSIGMA 'C' Panel Construction

Coverage

N/A

BBVA Campus
Commercial

BBVA Campus

Lima, Peru

2,732 SF manual operable partition system with remote stack on #2 track. Premium training and flexible space division at BBVA's Lima corporate campus. OLMO VOLGA finish with essence. Completed 2023.

SYSTEMS:

Manual Operation — Remote StackALPHA Panel ConstructionStandard Vinyl Finish

Coverage

2,732 SF

LA Lakers Headquarters
Commercial

LA Lakers Headquarters

El Segundo, CA

2,040 SF electric bi-parting SIGMA 'C' panel system on #8 track with invisible SOSS hinges. Premium sports facility partition at Lakers practice headquarters. Arch: Rossetti. GC: Morley Builders Inc. Completed 2016.

SYSTEMS:

Electric Operation — Bi-PartingSIGMA 'C' PanelInvisible SOSS Hinges

Coverage

2,040 SF

Calty Design Center
Commercial

Calty Design Center

Newport Beach, CA

225 SF electric bi-parting Vision operable partition system at Toyota's Calty Design Center. Premium corporate presentation and design space. Completed 1991.

SYSTEMS:

Electric OperationVision Bi-Parting PanelsPresentation Room Configuration

Coverage

225 SF

OSRAM Sylvania Technical Center
Commercial

OSRAM Sylvania Technical Center

Danvers, MA

Electric curved operable partition system with ALPHA 'S' panels. Custom powder coat trim with standard fabric finish. Architect: Design Plus. Completed 1994.

SYSTEMS:

Electric OperationCurved Track#4 Track SystemALPHA 'S' Panel

Coverage

N/A

Margaret Mead Elementary
Educational Facilities

Margaret Mead Elementary

Sammamish, WA

1,737 SF dual-system installation at Margaret Mead Elementary. Electric SIGMA 'E' panels for the gymnasium, manual SIGMA 'E' panels for classrooms and music room. Architect: BLRB Architects. Completed 2019.

SYSTEMS:

Electric Continuously HingedSIGMA 'E' Panel#8B TrackManual Operation#1 TrackP-Lam, Markerboard, Carpet & Vinyl

Coverage

1,737 SF

Sartori Elementary School
Educational Facilities

Sartori Elementary School

Renton, WA

Dual-system installation combining electric continuously hinged SIGMA 'E' panels on #8B track with manual SIGMA 'E' individual panels in a school-specified alternating checkerboard fabric finish. Multipurpose commons and stage space. Architect: Integrus Architecture.

SYSTEMS:

Electric Continuously HingedManual Individual PanelsSIGMA 'E' Panel Construction#8B Track

Coverage

N/A

Ready to Start Your Project?

Contact our team to discuss your architectural railing needs and get a custom quote.

Advanced Equipment Corporation

World class operable partition manufacturer since 1957. Family owned and operated.

2401 West Commonwealth Avenue, Fullerton, CA 92833

714-635-5350

Products

  • Operable Partitions
  • Spacematic Systems
  • Folding Glass Walls
  • Curved Track Systems

Resources

  • Technical Data
  • Installation Services
  • LEED Information

Company

  • About Us
  • Service & Repair
  • Warranties
  • Contact

© 2026 Advanced Equipment Corporation. All rights reserved.

Privacy PolicyTerms of ServiceSitemapPage Tracker