Advanced Equipment Corporation
Contact
Margaret Mead Elementary School
All Projects
Educational Facilities

Margaret Mead Elementary

Sammamish, WA

Location

Sammamish, WA

Project Type

K-12 Education

Sq. Footage

1,737 SF

Completed

2019

Architect

BLRB Architects

Project Overview

Advanced Equipment Corporation installed a 1,737 SF dual-system operable partition installation at Margaret Mead Elementary School in Sammamish, Washington, designed by BLRB Architects and completed in 2019. The project features both electric and manual operation to serve the school's varied spaces — from the gymnasium to classrooms and the music/performance room.

The electric system uses continuously hinged SIGMA 'E' panels on a #8B track, providing smooth bi-parting operation in the gymnasium that allows the space to open into the adjacent commons area for assemblies, events, and large gatherings. The two-tone finish — grey fabric upper and tan/vinyl lower — is durable and purpose-built for high-traffic educational environments.

The manual system uses SIGMA 'E' panels on a #1 track in the classrooms and music room, with a multi-finish approach including P-Lam, markerboard, carpet, and vinyl. The markerboard panels in the music room double as an interactive teaching surface, maximizing utility in every square foot of the installation.

Project Gallery

Margaret Mead Elementary gymnasium with two-tone operable partitions partially open
1 / 4

Electric continuously hinged SIGMA 'E' panels on #8B track — bi-parting configuration dividing gymnasium from commons

Systems Installed

System 1 — Gymnasium

Electric Continuously Hinged

  • Operation: Electric
  • Configuration: Continuously Hinged, Bi-Parting
  • Track: #8B Track
  • Panel: SIGMA 'E' Panel
  • Finishes: Carpet & Vinyl
System 2 — Classrooms & Music Room

Manual Operation

  • Operation: Manual
  • Track: #1 Track
  • Panel: SIGMA 'E' Panel
  • Finishes: P-Lam, Markerboard, Carpet & Vinyl

More Work

Similar Projects

View All
Cedar Park Christian SchoolEducational Facilities

Cedar Park Christian School

Bothell, WA

Kimball Elementary SchoolEducational Facilities

Kimball Elementary School

Seattle, WA

LCISD Liberty Hill High SchoolEducational Facilities

LCISD Liberty Hill High School

Lubbock, TX

Have a similar project?

Our team specializes in multi-system operable partition installations for K-12 educational facilities across the Pacific Northwest and beyond.

Get a QuoteBuild a Spec
Advanced Equipment Corporation

World class operable partition manufacturer since 1957. Family owned and operated.

2401 West Commonwealth Avenue, Fullerton, CA 92833

714-635-5350

Products

  • Operable Partitions
  • Spacematic Systems
  • Folding Glass Walls
  • Curved Track Systems

Resources

  • Technical Data
  • Installation Services
  • LEED Information

Company

  • About Us
  • Service & Repair
  • Warranties
  • Contact

© 2026 Advanced Equipment Corporation. All rights reserved.

Privacy PolicyTerms of ServiceSitemapPage Tracker