
Renton, WA
Location
Renton, WA
Project Type
K–12 Education
Sq. Footage
1,445 SF
Completed
2018
Operation
Manual + Electric
Advanced Equipment Corporation provided and installed a dual-system operable partition solution at Sartori Elementary School in Renton, Washington. The 1,445 SF installation serves the school's multipurpose commons, enabling staff to seamlessly divide or open the space between the main commons floor and the proscenium stage for assemblies, performances, and physical education.
The manual system features SIGMA 'E' individual panels on a #2 track in standard fabric finish, while the electric system uses SIGMA 'E' continuously hinged panels on an #8B track with a plastic laminate finish. Both systems share a distinctive school-specified checkerboard design — panels are arranged in alternating white and grey, creating a bold graphic wall that doubles as an architectural feature in the commons.
The project was designed by Integrus Architecture and built by Forma Construction. Advanced Equipment managed full system design, engineering, and installation for both the manual and electric runs.
Architect
Integrus Architecture
General Contractor
Forma Construction
Track Systems
#2 Track (Manual) / #8B Track (Electric)
Finish
Standard Fabric / Plastic Laminate

SIGMA 'E' manual individual panels in standard fabric finish, arranged in a school-specified alternating white and grey checkerboard pattern
Our team can design manual and electric operable partition systems tailored to your school's multipurpose and performing arts spaces.