Project Overview
2,732 SF manual operable partition system with remote stack on #2 track. Premium training and flexible space division at BBVA's Lima corporate campus. OLMO VOLGA finish with essence. Completed 2023.
Advanced Equipment Corporation manual operable partition system at BBVA's Lima corporate campus. The installation features Gamma panels with remote stack on #2 track and standard finish with essence, providing premium training and flexible space division for the international banking institution. The remote stack configuration keeps panels completely out of sight when not in use, maximizing usable floor space for large training sessions. When deployed, the partitions create multiple smaller meeting rooms for team breakouts.




