Advanced Equipment Corporation
Contact
Cedar Park Christian School
All Projects
Educational Facilities

Cedar Park Christian School

Bothell, WA

Location

Bothell, WA

Project Type

K-12 Education

Sq. Footage

2,920 SF

Completed

2004

Project Overview

Advanced Equipment Corporation operable partition system at Cedar Park Christian School in Bothell, Washington. The installation features both electric and manual operation options, providing maximum flexibility for the school's classroom and gymnasium facilities.

The electric system utilizes continuously hinged ALPHA 'U' panels with bi-parting configuration on a #8 track, allowing for smooth automated operation of the full-width partition that divides the main gymnasium space. This setup enables staff to quickly reconfigure the gym for multiple simultaneous activities.

Project Gallery

Cedar Park Christian School gymnasium with navy blue operable partitions
1 / 2

Full-width ALPHA 'U' continuously hinged panels with electric bi-parting operation on #8 track

More Work

Similar Projects

View All
LCISD Liberty Hill High SchoolEducational Facilities

LCISD Liberty Hill High School

Lubbock, TX

Del Oro High SchoolEducational Facilities

Del Oro High School

Loomis, CA

Kimball Elementary SchoolEducational Facilities

Kimball Elementary School

Seattle, WA

Have a similar project?

Our team specializes in reliable manual paired panel systems for K-12 educational facilities.

Get a QuoteBuild a Spec
Advanced Equipment Corporation

World class operable partition manufacturer since 1957. Family owned and operated.

2401 West Commonwealth Avenue, Fullerton, CA 92833

714-635-5350

Products

  • Operable Partitions
  • Spacematic Systems
  • Folding Glass Walls
  • Curved Track Systems

Resources

  • Technical Data
  • Installation Services
  • LEED Information

Company

  • About Us
  • Service & Repair
  • Warranties
  • Contact

© 2026 Advanced Equipment Corporation. All rights reserved.

Privacy PolicyTerms of ServiceSitemapPage Tracker