
Bothell, WA
Location
Bothell, WA
Project Type
K-12 Education
Sq. Footage
2,920 SF
Completed
2004
Advanced Equipment Corporation operable partition system at Cedar Park Christian School in Bothell, Washington. The installation features both electric and manual operation options, providing maximum flexibility for the school's classroom and gymnasium facilities.
The electric system utilizes continuously hinged ALPHA 'U' panels with bi-parting configuration on a #8 track, allowing for smooth automated operation of the full-width partition that divides the main gymnasium space. This setup enables staff to quickly reconfigure the gym for multiple simultaneous activities.

Full-width ALPHA 'U' continuously hinged panels with electric bi-parting operation on #8 track
Our team specializes in reliable manual paired panel systems for K-12 educational facilities.